![]()
The verification campaign ran from October 2024 through September 2025. Engineers examined how hydrogen could be safely integrated into existing gas infrastructure while monitoring issues such as seal integrity, thermal efficiency, emissions, and metal fatigue.
Read Entire Article
Source link
Kawasaki unveils world's first gas engine fueled by a 30% hydrogen blend
Tech
February 17, 2026